Water · Open

Water treatment

Works flow, the duty pump and the clearwell. Turbidity and chlorine stay on the analyser panel.

Three numbers

The shift watches these. A pilot sets the baseline in the first measured month.

Works flow

On the shift

Flow against the expected range for the hour

Pump vibration

On the shift

Duty-set vibration against its band

Clearwell level

On the shift

Level, with a low alarm before supply fails and a high alarm before it overflows

What the shift sees

Diagram
A pilot sets the baseline in the first measured month. Nothing in this diagram is a factory result.

The process

One stage at a time. Open a step to see what it senses and why that matters.

Treatment train

Process flow, Duty pump vibration, Process energy

Works flow and duty-pump vibration. Turbidity/chlorine stay on the analyser panel.

Request this plant

Certified sensors, an industrial gateway, connectivity, the platform, analytics, then FactoraERP. The six layers are the same for every factory type. Prices are quoted after the survey.

Pilot request

Request a pilot or an implementation

Tell us the site and the line you want to start with. Prices are quoted after the survey, and they are not published here.

  1. We read the request.
  2. We reply from the implementation team.
  3. A survey sets the quote. No price is published here.
Who to reply to
The line to start