Manufacturing · Open

General processing

A first line when the plant does not match a specialist layout: energy and vibration on the main drive, then the probes the survey adds.

Three numbers

The shift watches these. A pilot sets the baseline in the first measured month.

Drive vibration

On the shift

Main motor vibration against its band

Line energy

On the shift

Feeder kilowatt-hours for the shift

Sensors reporting

On the shift

Devices online against devices installed

What the shift sees

Diagram
A pilot sets the baseline in the first measured month. Nothing in this diagram is a factory result.

The process

One stage at a time. Open a step to see what it senses and why that matters.

Production Line 1

Drive vibration, Line energy

Start with energy and vibration on the main drive. Add process probes later in the registry.

Request this plant

Certified sensors, an industrial gateway, connectivity, the platform, analytics, then FactoraERP. The six layers are the same for every factory type. Prices are quoted after the survey.

Pilot request

Request a pilot or an implementation

Tell us the site and the line you want to start with. Prices are quoted after the survey, and they are not published here.

  1. We read the request.
  2. We reply from the implementation team.
  3. A survey sets the quote. No price is published here.
Who to reply to
The line to start