Healthcare & pharma · Open

Medical devices

Assembly humidity, the clean store, and a cold hold only when kits need one.

Three numbers

The shift watches these. A pilot sets the baseline in the first measured month.

Room humidity

On the shift

Time outside the band the process and the static control need

Store door

On the shift

Open events on the component store

Cell energy

On the shift

Assembly feeder kilowatt-hours for the shift

What the shift sees

Diagram
A pilot sets the baseline in the first measured month. Nothing in this diagram is a factory result.

The process

One stage at a time. Open a step to see what it senses and why that matters.

Controlled assembly

Room temperature, Room humidity, Cell drive vibration, Cell energy

ESD/humidity band, line energy, critical-drive vibration (press or conveyor).

Request this plant

Certified sensors, an industrial gateway, connectivity, the platform, analytics, then FactoraERP. The six layers are the same for every factory type. Prices are quoted after the survey.

Pilot request

Request a pilot or an implementation

Tell us the site and the line you want to start with. Prices are quoted after the survey, and they are not published here.

  1. We read the request.
  2. We reply from the implementation team.
  3. A survey sets the quote. No price is published here.
Who to reply to
The line to start