Food & beverage · Open

Meat & poultry

Hall temperature, the chill, and the dock door. A blast freezer is added only when the site freezes.

Three numbers

The shift watches these. A pilot sets the baseline in the first measured month.

Hall temperature

On the shift

Time the process hall spends above its hygiene cap

Chill temperature

On the shift

Time the carcass or product chill spends above 4 °C

Dock open time

On the shift

Minutes the dispatch door stays open

What the shift sees

Diagram
A pilot sets the baseline in the first measured month. Nothing in this diagram is a factory result.

The process

One stage at a time. Open a step to see what it senses and why that matters.

Process hall

Hall air temperature, Hall humidity, Line drive vibration, Hall energy

Hall air often ≤12 °C. Line energy and the main conveyor/drive vibration. Washdown housings.

Request this plant

Certified sensors, an industrial gateway, connectivity, the platform, analytics, then FactoraERP. The six layers are the same for every factory type. Prices are quoted after the survey.

Pilot request

Request a pilot or an implementation

Tell us the site and the line you want to start with. Prices are quoted after the survey, and they are not published here.

  1. We read the request.
  2. We reply from the implementation team.
  3. A survey sets the quote. No price is published here.
Who to reply to
The line to start