Silo level
On the shiftCement left before the next delivery
Mining & heavy industry · Open
Silo level, mixer vibration and the water that goes into the batch.
The shift watches these. A pilot sets the baseline in the first measured month.
Cement left before the next delivery
Gearbox vibration against the heavy-plant band
Water volume against the mix design
One stage at a time. Open a step to see what it senses and why that matters.
Cement silo level, Packhouse humidity
Radar level on cement silo. Humidity in the packhouse if you bag.
Certified sensors, an industrial gateway, connectivity, the platform, analytics, then FactoraERP. The six layers are the same for every factory type. Prices are quoted after the survey.